<?xml version="1.0"?><!DOCTYPE wml PUBLIC "-//WAPFORUM//DTD WML 1.1//EN" "http://www.wapforum.org/DTD/wml_1.1.xml">

<wml>
<card id="card1" title="CCO Real Time Data">
<p>
<small>



       <b>Additional Information for Sandown Bay</b><br/><br/>
<!-- =================================== Display information page=================================== -->

                     <div style="width: 700px">
	       <table border="1">
    <tbody>
        <tr>
            <td><b>Location</b></td>
            <td>50&#176;39.02712'N&nbsp;&nbsp;&nbsp;&nbsp; 001&#176; 07.76160' W</td>
        </tr>
        <tr>
            <td><strong>Approximate water depth</strong></td>
            <td>10.7m CD</td>
        </tr>
        <tr>
            <td><strong>Tidal Range</strong></td>
            <td>Approx spring tidal range = 3.3m</td>
        </tr>
    </tbody>
</table>
<p><strong><span style="color: rgb(255, 0, 0);"><span style="color: rgb(0, 0, 0);"></span>&nbsp;</span></strong></p>
<p><strong><span style="color: rgb(255, 0, 0);">Wave parameters are recorded using a Datawell Directional WaveRider Mk III buoy. The buoy was deployed on 10 July 2003 from the MV Wessex Explorer.</span></strong></p>
<table border="0">
    <tbody>
        <tr>
            <td><strong>06/12/2012</strong></td>
            <td>Service to replace batteries. Data transmission re-established</td>
        </tr>
        <tr>
            <td><strong>04/12/2012</strong></td>
            <td>Data stopped being transmitted at 21:30. Will be serviced at earliest opportunity.</td>
        </tr>
        <tr>
            <td><strong>25/07/2012</strong></td>
            <td>Scheduled service</td>
        </tr>
        <tr>
            <td><strong>17/01/2012</strong></td>
            <td>Scheduled service</td>
        </tr>
        <tr>
            <td><strong>19/02/2011</strong></td>
            <td>Scheduled service</td>
        </tr>
        <tr>
            <td><strong>03/06/2010</strong></td>
            <td>Scheduled service and hull swap due to poor paint work coverage and battery problems.</td>
        </tr>
        <tr>
            <td><strong>10/12/2009</strong></td>
            <td>Buoy was serviced, the buoy will need swapping for re-painting and new batteries.</td>
        </tr>
        <tr>
            <td><strong>27/07/2009</strong></td>
            <td>Scheduled Service.</td>
        </tr>
        <tr>
            <td><strong>13/02/2009</strong></td>
            <td>Service to replace DWR for repainting, re-lettering, new batteries and radar reflectors.</td>
        </tr>
        <tr>
            <td><strong>22/01/2008</strong></td>
            <td>Scheduled Service.</td>
        </tr>
        <tr>
            <td><strong>02/02/2007</strong></td>
            <td>The router has failed and is being reduced but the buoy is continuing to record data.</td>
        </tr>
        <tr>
            <td><strong>13/05/2004</strong></td>
            <td>W@ves21 software updated.</td>
        </tr>
        <tr>
            <td><strong>02/03/2004</strong></td>
            <td>Buoy has been serviced.</td>
        </tr>
        <tr>
            <td><strong>01/09/2003</strong></td>
            <td>The phone line problem has been fixed. Backlog of data has now been transferred.</td>
        </tr>
        <tr>
            <td><strong>28/08/2003</strong></td>
            <td>No data transferred due to phone line problems.</td>
        </tr>
        <tr>
            <td><strong>29/03/2010</strong></td>
            <td>Internet connection at Sandown shorestation is down, BT have been notified.</td>
        </tr>
    </tbody>
</table>        </div>
	   	   <a href="index.wml?loc=80">Back</a>
  
</small>
</p>
</card>
</wml> 
